| Jun.'10: DHL transport office cooler by 15°C / 26.3% |
|
Its transport office is air-conditioned and consumes a lot of electricity as the A/C constantly fights the scorching heat. Left: click on the photo to view the site in Google Maps. Office building structure:
This air gap heats up during the day, storing warmth radiating from the metal sheet roof. Painting process: The office's metal sheet rooftop was coated on May 24th with Planet Supra Thermal Barrier Paint in white color, with the objective of shielding the building from solar radiations and save on electricity cost for air-conditioning. Planet Supra was applied with rollers after dillution with 5% distilled water. Water had to be added regularly as it evaporated fast in ambient temperatures of above 40°C. Results: air gap temperature summary after painting Planet Supra:
Roof/ceiling air gap temperatures were recorded with electronic data loggers before and after painting, from 7am until 7pm.
|





Standard office building with concrete walls, metal sheet roof without insulating material, air gap between roof and ceiling (cf. photo on left). 