Bouygues Construction International chose its offices at The River condominium construction site in Bangkok to measure cost-savings achievable with Planet Supra. Once painted, the roof’s temperature was instantly reduced by 33%.
The air-conditioning system’s sensors automatically compensated for the decreased workload, which dropped by a daily 49.2% average. Consumption data was recorded by Bouygues’ team who installed kWh meters specially for this project.
The project in video
The project in pictures
Air-conditioned construction site office, 250 sqm / 2,690 sqf cement tile roof.
Planet Supra applied with airless spray gun, 2 coats, 200 microns total thickness.
Painted roof. Electronic temperature data loggers were placed under tiles for measurements.