Jun.'10: DHL transport office cooler by 15°C / 26.3%

DHL_Wangnoi_transport_office Share DHL's distribution center for BigC in Wangnoi, Thailand, is located on a flat piece of land with no shade coming from surrounding structures or trees.

Its transport office is air-conditioned and consumes a lot of electricity as the A/C constantly fights the scorching heat.

Left: click on the photo to view the site in Google Maps.


Office building structure:

DHL_Wangnoi_transport_office_structureDHL_Wangnoi_-_Transport_office_roof_undersideStandard office building with concrete walls, metal sheet roof without insulating material, air gap between roof and ceiling (cf. photo on left).

This air gap heats up during the day, storing warmth radiating from the metal sheet roof.


Painting process:

The office's metal sheet rooftop was coated on May 24th with Planet Supra Thermal Barrier Paint in white color, with the objective of shielding the building from solar radiations and save on electricity cost for air-conditioning.

Planet Supra was applied with rollers after dillution with 5% distilled water. Water had to be added regularly as it evaporated fast in ambient temperatures of above 40°C.


Results: air gap temperature summary after painting Planet Supra:

Planet_Supra_-_Heat_load_reduction

Roof/ceiling air gap temperatures were recorded with electronic data loggers before and after painting, from 7am until 7pm. DHL_Wangnoi_-_Roof_air_gap_temperature